{"id":565,"date":"2017-05-10T12:35:06","date_gmt":"2017-05-10T16:35:06","guid":{"rendered":"https:\/\/ncocra.org\/WordPress_v1\/?p=565"},"modified":"2024-11-29T11:23:27","modified_gmt":"2024-11-29T16:23:27","slug":"field-day-update-may-10-2017","status":"publish","type":"post","link":"https:\/\/ncocra.org\/WordPress_v1\/2017\/05\/10\/field-day-update-may-10-2017\/","title":{"rendered":"Field Day Update May 10, 2017"},"content":{"rendered":"<p>Hi All-<\/p>\n<p>We worked out some more logistics for Field Day. Bruce N1LN&#8217;s classes on the N1MM logging program are progressing nicely, with all of the band captains having been exposed to at least part of it. We should have everyone up to speed on using this one program this year. Testing will be done this week on Wilson&#8217;s property for the wireless network that will link all of the logging computers. If all goes well, all stations will be feeding their contacts into one master log, making it a snap for making our results submission. In the event of a network failure, or if someone&#8217;s logging computer just cannot access the network, we will go to the old tried and true method of backing up logs from the laptops onto a thumb drive, so that I can perform a merge afterward.<\/p>\n<p>We have had to make some shifts to maintain a 9A Battery classification, but it also looks like we will am almost 100% Elecraft operation. Here is the current lineup:<\/p>\n<p>CW:<br \/>\n3 transmitters on 80\/40\/20\/15 meters, Elecraft K3 &#8211; in MCU<\/p>\n<p>Digital:<br \/>\n40 Meter PSK31 Elecraft K3 &#8211; barn loft<br \/>\n20\/15 Meter PSK31 Elecraft KX-3 &#8211; barn loft<\/p>\n<p>Phone:<br \/>\n80 Meter SSB Elecraft K3- out of RV<br \/>\n40\/15 Meter SSB Elecraft K3- out of camper<br \/>\n20 Meter SSB Phone Elecraft KX-3 &#8211; out of tent<br \/>\n10 Meter SSB Phone Radio Shack HTX-10 &#8211; out of barn loft<\/p>\n<p>Skip, N4SKP will be providing a sandwich platter at Noon on that Friday for the work crews. John, KM4MDR will be coordinating the pot luck to be held that Friday night. Lad, W4ORD is working out the food supplies for the Saturday night dinner and the Sunday morning breakfast,, he will solicit side dishes or desserts that anyone may want to supply.<\/p>\n<p>Also, both to garner the 100 point bonus for Social Media Publicity, and to provide yet another channel for members\u00a0 and visitors to get updates on our Field Day operation, I have created a Facebook group:<\/p>\n<p><a href=\"https:\/\/www.facebook.com\/groups\/191232484731133\/\">OCRA-DFMA Amateur Radio Field Day W4EZ<\/a><\/p>\n<p>Facebookers, feel free to join and help provide content, photographs from previous FD operations would be great to add!<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hi All- We worked out some more logistics for Field Day. Bruce N1LN&#8217;s classes on the N1MM logging program are progressing nicely, with all of the band captains having been exposed to at least part of it. We should have &hellip; <a href=\"https:\/\/ncocra.org\/WordPress_v1\/2017\/05\/10\/field-day-update-may-10-2017\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"quote","meta":{"footnotes":""},"categories":[12],"tags":[],"class_list":["post-565","post","type-post","status-publish","format-quote","hentry","category-field-day","post_format-post-format-quote"],"acf":[],"_links":{"self":[{"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/posts\/565","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/comments?post=565"}],"version-history":[{"count":5,"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/posts\/565\/revisions"}],"predecessor-version":[{"id":8480,"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/posts\/565\/revisions\/8480"}],"wp:attachment":[{"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/media?parent=565"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/categories?post=565"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ncocra.org\/WordPress_v1\/wp-json\/wp\/v2\/tags?post=565"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}